Shemya's First Metrology (PMEL) Lab, 1975


THE PMEL WAS ORGANIZED AND PUT INTO
OPERATION BY THE FOLLOWING PERSONNEL:
SMITH, MALCOLM A. MSGT
21 January 1975

TYLER, JAMES C. TSGT
15 February 1975

AHNER, DENNIS E. SSGT
28 February 1975

SEGEBARTH, MICHAEL P. SSGT
10 March 1975

WADE, DOUGLAS L. SGT
10 March 1975

ALVIS, DAVID L. SGT
8 April 1975

RIEGEL, GEORGE W. MSGT
11 April 1975

SMITH, GEORGE L. TSGT
15 April 1975

RICHARDSON, EDDIE W. SSGT
3 June 1975

GRASSO, ROBERT A. SGT
15 July 1975


2 SEPTEMBER 1975



Shemya's First PMEL, 1975

From left to right: Alvis, Wade (kneeling), Segebarth, Ahner (kneeling), Grasso (kneeling), Smith (Malcolm), Richardson, Tyler, Smith (George), Riegel